POPE of major schemes: A23 Handcross to Warninglid
These documents summarise the findings of the one year after evaluation study.
Documents
Details
Documents summarising the findings of the One Year After (OYA) Post Opening Project Evaluation (POPE) for A23 Handcross to Warninglid (dual two lane to a dual three lane carriageway to remove a bottleneck).